Important Information to Register Restaurant on Dubai Mainland
03/04/2013
By
flyingcolour
The minimum size for the kitchen should be 400 sq.ft. The client’s fit out contractor has to approve fit out drawing from Dubai municipality. Approval from health and safety and Drainage department is also required. The final issuance of trade license is connected with the time frame of the fit out contractor.